DynaRoad v5.5.2.236802 (x86/x64) | 158 MB
A significant portion of heavy civil construction costs are related to earthworks. DynaRoad is a project management software specially developed for optimizing these costs. It enables benefits in all project phases allowing quicker and more accurate planning and analysis compared to traditional tools.
Scheduling
DynaRoad provides a complete scheduling system specially developed to meet the demands of heavy and highway construction. The schedule is built up either manually or resource-based according to the mass haul plan. DynaRoad is the only tool on the market that combines location based CPM scheduling with mass haul optimization.
Display planning on your map
Map based planning is the perfect tool for complex traffic planning, site work and presenting our work. The schedule is planned and presented directly on the project map. Move back and forth in time and display location of crews, traffic planning, completed tasks and other information color coded on the map at any given time of the project.
Location-based control
The Time-Location view gives you an excellent overview of the project in one single view; production order, movement of crews, haul distances, production breaks and risk zones. DynaRoad gives you systematic control of actual workflow during construction. Input work progress information for a complete project status report comparing real production results to the original schedule. Intelligent production forecasts warn you weeks in advance of upcoming problems.
Resource planning
In DynaRoad activities are built up based on amount of work, resources and production rates. All views are linked and updated in real time. This gives you full control of machine capacity needed, while securing that your schedules are realistic and possible to complete on time. Data on resources, crews and production rates are all saved in a template file to support future projects.
Mass haul management
DynaRoad Plan software gives you an optimized mass haul plan with the shortest haul distances possible while ensuring efficient use of all available materials. Expensive mass deficit and surplus are easily eliminated and evaluation of alternative design solutions is fast and inexpensive.